Renovation of Mettlach Bridge over the Saar River in Germany, was carried out by Eiffel Deutschland Stahltechnologie (EDS) using prefabricated SPS panels to replace the existing concrete bridge deck.  Use of SPS deck panels reduced the deck weight by 300 tonnes, allowing load restrictions on the new bridge deck to be lifted compared to the aging bridge. Works were completed within four months. 

The project was recognised with a Distinction in the 2015 Ulrich Finsterwalder Structural Engineering Awards.